Multi-Tier Azek Deck West Long Branch

Before:

The original existing deck had many issues.  Structural members were Doug Fir lumber that had been stained and/or painted.  The drainage from the gutter configuration was not adequate, creating a overflow problem onto the deck.  Thus, creating deterioration on the deck as well as facilitating vegetation growth under the deck.  The entire structure was unworkable and was removed.





After:

New deck structrual was constructed with ACQ pressure-treated lumber with joists placed 12" apart (12" On Center). Drainage gutters where enlarged to 6" gutters to eliminate the overflow problem.  Azek decking was installed using hidden fasteners.  Multipie Azek deck colors were used.  Raised tier deck accommodates table with seating.  Custom built-in benches with planter boxes surround new paver stone, creating the inviting look.



1 comment:

  1. I really loved reading your blog. It was very well authored and easy to undertand. Unlike additional blogs I have read which are really not tht good. I also found your posts very interesting. In fact after reading, I had to go show it to my friend and he ejoyed it as well!
    Certified Precision Roofing

    ReplyDelete